Summer work on the FVL parking lot has begun. Concrete upgrades are continuing in the tower parking lot on the south side of school and the south driveway off Meade Street. The JJ/Edgewood driveway and the north Meade Street driveway will remain open. Please use the south lot to access the School and SCRIP Offices through mid-July.
